energy storage

100 kW / 215 kWh BESS Cabinet

An outdoor LFP battery energy storage cabinet with a 100 kW power rating and 215 kWh nominal energy rating.

  • LFP battery chemistry
  • 100 kW rated power
  • 215 kWh nominal energy
  • IP54 enclosure rating
Rated power
100 kW
Nominal energy
215 kWh
Nominal DC voltage
768 V
Battery chemistry
LFP
100 kW / 215 kWh BESS Cabinet

Product overview

This configuration is a candidate for commercial and industrial projects that need an integrated outdoor cabinet. Engineering review is still required for usable energy, duty cycle, grid connection, and site safety design.

Configuration note: nameplate values help define the starting point. Final usable energy, interfaces, operating limits, document scope, and commercial terms are confirmed for the specific project.

LFP battery chemistry

Review this attribute together with the complete system, destination requirements, and operating conditions.

100 kW rated power

Review this attribute together with the complete system, destination requirements, and operating conditions.

215 kWh nominal energy

Review this attribute together with the complete system, destination requirements, and operating conditions.

IP54 enclosure rating

Review this attribute together with the complete system, destination requirements, and operating conditions.

Key specifications

100 kW / 215 kWh BESS Cabinet — published technical data
ParameterValueCondition or note
Rated power100 kWConfirm final operating conditions in the project proposal.
Nominal energy215 kWhConfirm final operating conditions in the project proposal.
Nominal DC voltage768 VConfirm final operating conditions in the project proposal.
Battery chemistryLFPConfirm final operating conditions in the project proposal.
Enclosure ratingIP54Confirm final operating conditions in the project proposal.

Applications to evaluate

Commercial and industrial energy management

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Solar self-consumption

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Site-level resilience planning

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Review the application requirements

Selection, supply scope and engineering notes

  1. Confirm whether 100 kW is sufficient for the site's coincident peak and largest controlled load.
  2. Request nominal and usable energy values for the proposed operating window.
  3. Review clearance, foundation, cable routing, ambient conditions, fire strategy, and interconnection scope.

Confirm the project responsibility matrix

The product rating does not define a turnkey project scope. The quotation should identify who supplies, integrates, installs, commissions, and accepts each applicable item.

  • Battery system, BMS, thermal management, enclosure, internal protection, and communications
  • PCS, EMS or SCADA, transformer, switchgear, metering, external protection, and grid interface
  • Fire strategy, foundations, lifting, cable routing, installation, testing, and commissioning
  • Documentation, training, spare parts, warranty conditions, maintenance, and acceptance records

Technical documents

Use the public page and any available procurement brief for initial comparison. Request the applicable controlled data sheet, drawings, test or certificate evidence, and commercial documents for the exact quoted model and destination.

Guides for your technical review

Compare HUA-X 215 kWh and 261 kWh cabinets before requesting a proposal →

C&I BESS Sizing Guide

A defensible C&I battery energy storage system size comes from interval load data, a ranked operating objective, power constraints and usable energy at a stated measurement point. Start with the duty the site needs, then evaluate the cabinet or container configuration against it.

Read guide →

BESS Safety Review

A BESS safety review should connect cell and module behavior to electrical protection, BMS controls, thermal management, enclosure, fire strategy, emergency response, site layout, installation, and operating procedures.

Read guide →

BESS RFQ Checklist

A useful BESS RFQ states the operating objective, site data, power, usable energy, duration, electrical interface, environment, safety requirements, scope split, documents, and acceptance criteria.

Read guide →

Frequently asked questions

What buyers ask before specifying a battery system

Answers cover the information needed to confirm configuration, operating conditions, documentation, price, and delivery.

What information is needed to size a battery energy storage system?
Provide the load profile, target power and energy duration, grid or generator constraints, installation environment, operating temperature range, and the functions the system must perform. A single capacity figure is not enough for responsible system selection.
Is nameplate energy the same as usable energy?
Not necessarily. Usable energy depends on the permitted state-of-charge window, operating conditions, conversion losses, control strategy, and project limits. Ask for both nominal and usable values in the final proposal.
What safety information should a BESS proposal include?
A project proposal should identify the cell chemistry, electrical protection, BMS architecture, thermal management, enclosure rating, fire strategy, emergency isolation, monitoring, installation limits, and the standards required by the destination project.
Which certifications are available?
Certification scope varies by model and destination. Request the current certificate and test-report package for the exact quoted model.
Why are prices not published on the product pages?
The listed products are project-configured B2B systems or battery series. Pricing depends on configuration, quantity, accessories, packaging, destination, and commercial terms, so quotations are prepared against a defined project scope.
What is the production and delivery lead time?
Lead time is confirmed only after the configuration, quantity, compliance documents, packaging, and destination are known.

Discuss the 100 kW / 215 kWh Cabinet

Technical questions and quotation enquiries for this model.