Utility and renewable energy storage
Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.
Response target: within 12 hours for project inquiries
energy storage
A 5,016 kWh liquid-cooled DC battery container with twelve 418 kWh clusters, a nominal voltage of 1,331.2 V and an IP55 container enclosure.

SICE ONE@5016L supplies the battery side of a larger energy storage project. Define the PCS power, grid voltage, EMS interface and AC equipment separately from the container's DC energy rating and physical footprint.
| Parameter | Value | Condition or note |
|---|---|---|
| Model | SICE ONE@5016L | — |
| Nominal battery energy | 5,016 kWh DC | — |
| Battery arrangement | 12 × 418 kWh clusters | — |
| Nominal / operating voltage | 1,331.2 V / 1,164.8–1,497.6 V DC | — |
| Charge / discharge rate | Up to 0.5P | Quoted PCS rating and battery operating limits determine delivered AC power. |
| Thermal management | Liquid cooling | — |
| Enclosure protection | IP55 container / IP66 battery PACK | — |
| Dimensions (L × W × H) | 6,058 × 2,550 × 2,896 mm | — |
| Mass | 48 tonnes | — |
| Communications | RS485 / CAN | — |
Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.
Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.
The product rating does not define a turnkey project scope. The quotation should identify who supplies, integrates, installs, commissions, and accepts each applicable item.
Use the public page and any available procurement brief for initial comparison. Request the applicable controlled data sheet, drawings, test or certificate evidence, and commercial documents for the exact quoted model and destination.
A defensible C&I battery energy storage system size comes from interval load data, a ranked operating objective, power constraints and usable energy at a stated measurement point. Start with the duty the site needs, then evaluate the cabinet or container configuration against it.
Read guide →A battery container's MWh rating does not define a complete grid-connected AC energy storage system. Separate the DC battery boundary from PCS, transformer, switchgear, controls, civil works, installation, commissioning, and acceptance before comparing proposals.
Read guide →Frequently asked questions
Answers cover the information needed to confirm configuration, operating conditions, documentation, price, and delivery.
Technical questions and quotation enquiries for this model.