energy storage

WEIDA 115.2 kWh and 215 kWh Indoor DC Battery Cabinets

Air-cooled, 768 V DC battery cabinets with 150 Ah and 280 Ah options, IP21 enclosures and CAN/RS485 communications for indoor storage installations.

115.2 kWh cabinet
768 V / 150 Ah / 115.2 kWh nominal
215 kWh cabinet
768 V / 280 Ah / 215 kWh nominal
Battery operating voltage
672–876 V DC
115.2 kWh continuous charge / discharge
75 A / 75 A (0.5C)
WEIDA indoor battery cabinet with front access doors

Product overview

These cabinets supply a high-voltage DC battery connection. A project needs a compatible PCS, controls and AC-side protection to serve grid or building loads. Compare the battery current, enclosure dimensions and floor loading for the two sizes.

Configuration note: nameplate values help define the starting point. Final usable energy, interfaces, operating limits, document scope, and commercial terms are confirmed for the specific project.

Key specifications

WEIDA 115.2 kWh and 215 kWh Indoor DC Battery Cabinets — published technical data
ParameterValueCondition or note
115.2 kWh cabinet768 V / 150 Ah / 115.2 kWh nominal—
215 kWh cabinet768 V / 280 Ah / 215 kWh nominal—
Battery operating voltage672–876 V DC—
115.2 kWh continuous charge / discharge75 A / 75 A (0.5C)—
215 kWh continuous charge / discharge140 A / 140 A (0.5C)—
115.2 kWh dimensions / mass≤1,000 × 700 × 2,000 mm / ≤1,150 kgWidth × depth × height.
215 kWh dimensions / mass≤1,000 × 900 × 2,050 mm / ≤2,000 kgWidth × depth × height.
Enclosure / thermal managementIP21 / controlled air cooling—
Operating temperatureCharge 0–45 °C; discharge −20–60 °C—
Installation conditionsAltitude below 2,500 m; relative humidity below 95%, non-condensing—
Display / communications7-inch LCD / CAN, RS485 and dry contacts—

Applications to evaluate

Indoor commercial energy storage

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

DC battery integration with a separate PCS

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Selection, supply scope and engineering notes

  1. Specify PCS DC voltage and current limits, AC power, control protocol and protection coordination.
  2. Plan an indoor location with adequate ventilation, service access and floor load capacity.
  3. State the required usable energy and duty cycle alongside nominal battery capacity.

Confirm the project responsibility matrix

The product rating does not define a turnkey project scope. The quotation should identify who supplies, integrates, installs, commissions, and accepts each applicable item.

  • Battery system, BMS, thermal management, enclosure, internal protection, and communications
  • PCS, EMS or SCADA, transformer, switchgear, metering, external protection, and grid interface
  • Fire strategy, foundations, lifting, cable routing, installation, testing, and commissioning
  • Documentation, training, spare parts, warranty conditions, maintenance, and acceptance records

Technical documents

Use the public page and any available procurement brief for initial comparison. Request the applicable controlled data sheet, drawings, test or certificate evidence, and commercial documents for the exact quoted model and destination.

Guides for your technical review

C&I BESS Sizing Guide

A defensible C&I battery energy storage system size comes from interval load data, a ranked operating objective, power constraints and usable energy at a stated measurement point. Start with the duty the site needs, then evaluate the cabinet or container configuration against it.

Read guide →

Air vs Liquid Cooling

Air and liquid cooling are system-level choices. Compare heat density, temperature uniformity, ambient conditions, parasitic demand, acoustic limits, maintenance, fault response, and site layout—not capacity alone.

Read guide →

Frequently asked questions

What buyers ask before specifying a battery system

Answers cover the information needed to confirm configuration, operating conditions, documentation, price, and delivery.

Why are prices not published on the product pages?
The listed products are project-configured B2B systems or battery series. Pricing depends on configuration, quantity, accessories, packaging, destination, and commercial terms, so quotations are prepared against a defined project scope.
What is the production and delivery lead time?
Lead time is confirmed only after the configuration, quantity, compliance documents, packaging, and destination are known.

Discuss the 115.2 / 215 kWh Indoor DC Cabinets

Technical questions and quotation enquiries for this model.