Project Reference / Rayong, Thailand (signing location)

Rayong Commercial & Industrial Storage Project

A commercial and industrial energy storage profile for an automotive-parts facility in Rayong Province.

Source profile page for Rayong Commercial & Industrial Storage Project
Published project profile from page 27 of the 2026 HUA-X group introduction.

Project facts in the source

The HUA-X group introduction identifies a 500 kW / 1,044 kWh commercial and industrial energy storage system for Thailand Jianbang Jiantai Auto Parts Co., Ltd. It gives Nikhom Phatthana District, Rayong Province as the signing location.

Rayong is listed as the signing location; the installation address is not publicly disclosed.

Source: Chinese HUA-X group introduction, page 27; English HUA-X group introduction, page 27.

Application described in the profile

The Chinese source describes photovoltaic use, energy storage, peak shaving, valley filling, photovoltaic-storage coordination and system dispatch as intended application capabilities.

These are application descriptions, not measured outcomes. The available profile does not provide interval load or photovoltaic data, the dispatch strategy, export limits, tariff assumptions or measured self-consumption results.

Equipment and delivery boundary

The profile states the project scale but does not identify product models, equipment quantities, AC/DC measurement boundaries, the complete supply scope or acceptance status.

Do not infer PowerFac-261 cabinet quantities from the 1,044 kWh headline. Model identity, usable energy, PCS/EMS architecture, installation responsibility and operating results all require project confirmation.

Inputs for a comparable solar-plus-storage site

A comparable proposal should be based on the facility load, photovoltaic profile, target grid exchange and operating priorities.

  • Provide interval load and photovoltaic generation data.
  • Define target power, usable energy, reserve and measurement point.
  • Identify electrical, controls, installation, commissioning and acceptance responsibilities.
Prepare a comparable BESS project RFQ →

Plan a similar energy storage project

Need a system in the 500 kW / 1,044 kWh range?

Share the site, operating objective, load or generation profile, target capacity and delivery schedule for a project-specific configuration review.

Response target: within 12 hours. Supply scope, documents, lead time and warranty are confirmed with the quotation.