Fuping Grid-Side Energy Storage Development

A large grid-side independent energy storage development presented as supporting regional grid flexibility and industrial upgrading in Fuping County.

Source profile page for Fuping Grid-Side Energy Storage Development
Published project profile from page 24 of the 2026 HUA-X group introduction.

Project facts in the source

The HUA-X group introduction labels this as a 200 MW / 400 MWh grid-side independent energy storage project and gives Fuping County, Shaanxi Province as the signing location.

The same page records a project groundbreaking ceremony. It does not provide a commissioning date, installed equipment list, operating data or acceptance record.

Source: 2026 HUA-X group introduction, page 24.

Objective stated in the profile

The source positions the development as supporting the stated dual-carbon strategy, facilitating flexible regulation of the regional power grid and driving regional industrial upgrading.

This is a stated project objective, not evidence of delivered grid services, availability, revenue or measured renewable-energy impact.

Stage, equipment and responsibility boundary

The group introduction does not identify the battery model, container quantity, PCS or transformer architecture, HUA-X contractual role, construction progress or current operating status.

A quotation for a comparable grid-side project must confirm the full battery and AC scope, grid requirements, civil works, installation, commissioning, acceptance tests and responsible parties.

Inputs for a comparable grid-side project

Start from the required grid service, connection point, dispatch profile and responsibility matrix rather than copying the headline power and energy figures.

  • Define continuous and transient power duties, duration, reserve and life-stage basis.
  • Provide grid-code, site, ambient, altitude and access requirements.
  • Separate the DC battery scope from PCS, transformer, switchgear, protection, controls, civil works and commissioning.
Prepare a comparable BESS project RFQ →

Plan a similar energy storage project

Need a system in the 200 MW / 400 MWh range?

Share the site, operating objective, load or generation profile, target capacity and delivery schedule for a project-specific configuration review.

Response target: within 12 hours. Supply scope, documents, lead time and warranty are confirmed with the quotation.