HUA-X battery project reference / Bari province, Puglia, Italy
Seasonal Storage Operation Supports an Olive Mill in Puglia
A Puglia olive mill paired its 180 kWp solar installation with 100 kW / 215 kWh storage, adapting operation between the intensive harvest season and quieter months.

Two very different operating seasons
The olive harvest kept a mill in Puglia operating around the clock from November through January. For much of the rest of the year, processing demand was low. Its 180 kWp rooftop solar system consequently exported substantial energy during quieter months while the mill faced sharp production peaks during harvest.
The customer needed storage that could serve different purposes over the year: use more solar generation for local loads outside the harvest season and limit grid-demand spikes when the processing line was running.
Dispatch adapted to the mill's calendar
A PowerFac 100 kW / 215 kWh system was installed with metering components. Outside the harvest season, stored solar energy supplied cold-storage and office loads. During harvest, the system supported the brief demand increase when the pressing line started.
The starting event raised facility load from approximately 120 kW to 310 kW for 90 seconds. Storage helped keep grid demand within the mill's 250 kW contracted-power limit. This short power event had a different requirement from storing solar energy for later use.
Project economics
Combined energy shifting and demand-related savings were approximately €31,000 a year. Using only the €34,500 equipment price, the simple-payback estimate is approximately 1.1 years. This excludes the €6,800 connection-related testing and documentation cost and any other installation costs. The connection process took ten weeks.
The storage strategy followed the seasonal business: the same battery served recurring everyday loads in one period and production-start demands in another.
Project FAQ
Questions about this project reference
Configuration, application and operating conditions for this project.
Why did the olive mill change its storage strategy with the season?
How could a 100 kW system help with a 310 kW load peak?
What should a buyer compare with the quoted project investment?
Plan a similar battery project
Discuss storage for seasonal manufacturing loads
Share the application, destination, operating requirements, quantity and schedule to discuss a configuration for your project.
Response target: within 12 hours. Supply scope, documents, lead time and warranty are confirmed with the quotation.