energy storage

WEIDA Integrated Container Energy Storage Systems

Prefabricated LFP containers with 400 kW / 860 kWh and 600 kW / 2.58 MWh grid-connected configurations, integrated battery controls and bidirectional power conversion.

CESS400kW-860kWh
400 kW on grid, 250 kW off grid, 860 kWh
CESS600kW-2580kWh
600 kW on or off grid, 2.58 MWh
Battery chemistry and nominal DC voltage
LFP, 768 V
AC grid voltage / frequency
380 or 400 V, 50 or 60 Hz
Integrated WEIDA container energy storage system

Product overview

The smaller configuration delivers 400 kW on grid and 250 kW off grid. The larger configuration is rated at 600 kW in either mode. For a 1.2 MW / 2.58 MWh project, the PCS arrangement and grid connection must be sized for the higher power.

Configuration note: nameplate values help define the starting point. Final usable energy, interfaces, operating limits, document scope, and commercial terms are confirmed for the specific project.

Key specifications

WEIDA Integrated Container Energy Storage Systems — published technical data
ParameterValueCondition or note
CESS400kW-860kWh400 kW on grid, 250 kW off grid, 860 kWh—
CESS600kW-2580kWh600 kW on or off grid, 2.58 MWh—
Battery chemistry and nominal DC voltageLFP, 768 V—
AC grid voltage / frequency380 or 400 V, 50 or 60 Hz—
EnclosureIP54—

Applications to evaluate

Site peak management

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Renewable integration

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Microgrid storage

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Selection, supply scope and engineering notes

  1. Provide the required power separately for grid-connected and islanded operation.
  2. Confirm transformer scope, protection coordination and usable energy at the site.

Confirm the project responsibility matrix

The product rating does not define a turnkey project scope. The quotation should identify who supplies, integrates, installs, commissions, and accepts each applicable item.

  • Battery system, BMS, thermal management, enclosure, internal protection, and communications
  • PCS, EMS or SCADA, transformer, switchgear, metering, external protection, and grid interface
  • Fire strategy, foundations, lifting, cable routing, installation, testing, and commissioning
  • Documentation, training, spare parts, warranty conditions, maintenance, and acceptance records

Technical documents

Use the public page and any available procurement brief for initial comparison. Request the applicable controlled data sheet, drawings, test or certificate evidence, and commercial documents for the exact quoted model and destination.

Frequently asked questions

What buyers ask before specifying a battery system

Answers cover the information needed to confirm configuration, operating conditions, documentation, price, and delivery.

Why are prices not published on the product pages?
The listed products are project-configured B2B systems or battery series. Pricing depends on configuration, quantity, accessories, packaging, destination, and commercial terms, so quotations are prepared against a defined project scope.
What is the production and delivery lead time?
Lead time is confirmed only after the configuration, quantity, compliance documents, packaging, and destination are known.

Discuss the 860 kWh and 2.58 MWh CESS

Technical questions and quotation enquiries for this model.