A Łódź distribution centre converted 46 forklifts to lithium batteries and twelve distributed charging points, allowing a 260 m² charging room to become picking space.

The charging room occupied useful logistics space
An e-commerce distribution centre in Łódź operated 46 forklifts across two shifts. Its former battery arrangement required a 260 m² charging room with 46 positions and dedicated ventilation equipment. The ventilation and hydrogen-management provision had cost €38,000.
The customer wanted a charging approach that fitted short breaks and reduced the space devoted to the old battery routine.
Twelve charging points within the working layout
The project fitted 400 Ah lithium packs to the 48 V forklift fleet and provided twelve charging points using 15 kW chargers. Drivers charged during breaks, bringing replenishment closer to the work areas instead of moving every truck to the former room.
The previous charging room was reassigned to picking operations. The change made the 260 m² useful to the warehouse's core activity while supporting the two-shift schedule.
Space and energy investment considered together
At the site's space-cost basis of €4.2 per square metre per month, the released area represented approximately €13,100 annually. Total project investment was €268,000, covering 46 battery groups, twelve chargers and electrical modifications.
A 30% project subsidy reduced the customer's expenditure to approximately €188,000. The conversion combined an energy-system change with a measurable improvement in how warehouse floor space was used.
Project FAQ
Questions about this project reference
Configuration, application and operating conditions for this project.
How could twelve charging points support forty-six forklifts?
What did reassigning the 260 m² room contribute financially?
How did the subsidy affect the customer's investment?
Plan a similar battery project
Discuss forklift charging within your warehouse layout
Share the application, destination, operating requirements, quantity and schedule to discuss a configuration for your project.
Response target: within 12 hours. Supply scope, documents, lead time and warranty are confirmed with the quotation.